Various works including a 58 space staff car park withnew LED street lighting,surface water drainage,a 1,000m2 Grid-force permeable paving system overflow car park, 200m temporary site hoardings,removal of temporary accommodation, footpath worksand internal office fit-out within an industrial unit.
Construction operations within a live environment
Operating within strict pharmaceutical health and safety and security guidelines
Phased co nstruction programme to suit client development schedule